Områder

Tau Industrial Park

Ready to build. 7-hectare site. Immediate access to 3 MW power, short distance to deep-sea port. Located in an existing industrial park. Excellent logistics and good infrastructure. A plan is in place for a new 132kV substation in the Tau area including Nordmarka.

Central location within 30 minutes from Stavanger and International Airport.

For more information about this site, please get in touch with us.


  • 3 mw
  • 7
  • 10 ping
  • 0 mts

Site properties

Area name Tau Næringspark
Ready to start building construction within months 3
Hectars available at plot 7
Square meters available at plot 70 000
Plot expansion (m2) 0
Region The Stavanger region
Municipality Strand
Location coordinates 59.088594 N 5.917687 E
Yearly avg air temperature 7

Time to market

Ready to start building construction within months 3
Plot procurement status reserved

Power

Power available now (MW) 3
Power available in 12 months (MW) 3
Power available in 24 months (MW) 10
Power available in 36 months (MW) 20

Fiber

Latency to Dublin (ms) 15
Latency to London (ms) 10
Latency to New York (ms) 42
Latency to Frankfurt (ms) 13
Latency to Amsterdam (ms) 12
Latency to Stockholm (ms) 11
Latency to Oslo (ms) 6
Latency to Esbjerg (ms) 9
Latency to Newcastle (ms) 9
Dark fibre available yes
Fiber distance to 0
Fibre connection available at plot yes

Logistics

Distance international airport (km) 32
Distance to industry harbor (km) 1
Distance to university (km) 25

Andre områder