Områder
Ready to build. 7-hectare site. Immediate access to 3 MW power, short distance to deep-sea port. Located in an existing industrial park. Excellent logistics and good infrastructure. A plan is in place for a new 132kV substation in the Tau area including Nordmarka.
Central location within 30 minutes from Stavanger and International Airport.
For more information about this site, please get in touch with us.
Area name | Tau Næringspark |
Ready to start building construction within months | 3 |
Hectars available at plot | 7 |
Square meters available at plot | 70 000 |
Plot expansion (m2) | 0 |
Region | The Stavanger region |
Municipality | Strand |
Location coordinates | 59.088594 N 5.917687 E |
Yearly avg air temperature | 7 |
Ready to start building construction within months | 3 |
Plot procurement status | reserved |
Power available now (MW) | 3 |
Power available in 12 months (MW) | 3 |
Power available in 24 months (MW) | 10 |
Power available in 36 months (MW) | 20 |
Latency to Dublin (ms) | 15 |
Latency to London (ms) | 10 |
Latency to New York (ms) | 42 |
Latency to Frankfurt (ms) | 13 |
Latency to Amsterdam (ms) | 12 |
Latency to Stockholm (ms) | 11 |
Latency to Oslo (ms) | 6 |
Latency to Esbjerg (ms) | 9 |
Latency to Newcastle (ms) | 9 |
Dark fibre available | yes |
Fiber distance to | 0 |
Fibre connection available at plot | yes |
Distance international airport (km) | 32 |
Distance to industry harbor (km) | 1 |
Distance to university (km) | 25 |