Områder

Weatherlands

7-hectare site with 43 hectares expansion option. Close to a large wind farm and a new 132kV power line. Options for connecting to green energy from local wind farm.

The site is sloped in a northerly direction offering good potential to utilize the cold climate and build into the ground.

Ideal position between Stavanger and Egersund with access to the industrial harbor, workforce, and international airport.

For more information about this site, please contact us.

  • 0 mw
  • 7
  • 10 ping
  • 0 mts

Site properties

Area name Undheim
Ready to start building construction within months 3
Hectars available at plot 7
Square meters available at plot 70 000
Plot expansion (m2) 430 000
Region The Stavanger region
Municipality Time
Location coordinates 58.659N, 5.794E
Yearly avg air temperature 7

Time to market

Ready to start building construction within months 3
Plot procurement status reserved

Power

Power available now (MW) 0
Power available in 12 months (MW) 20
Power available in 24 months (MW) 20
Power available in 36 months (MW) 100

Fiber

Latency to Dublin (ms) 15
Latency to London (ms) 10
Latency to New York (ms) 42
Latency to Frankfurt (ms) 13
Latency to Amsterdam (ms) 12
Latency to Stockholm (ms) 11
Latency to Oslo (ms) 6
Latency to Esbjerg (ms) 9
Latency to Newcastle (ms) 9
Dark fibre available no
Fiber distance to 2000
Fibre connection available at plot no

Logistics

Distance international airport (km) 30
Distance to industry harbor (km) 25
Distance to university (km) 30

Andre områder