Områder
7-hectare site with 43 hectares expansion option. Close to a large wind farm and a new 132kV power line. Options for connecting to green energy from local wind farm.
The site is sloped in a northerly direction offering good potential to utilize the cold climate and build into the ground.
Ideal position between Stavanger and Egersund with access to the industrial harbor, workforce, and international airport.
For more information about this site, please contact us.
Area name | Undheim |
Ready to start building construction within months | 3 |
Hectars available at plot | 7 |
Square meters available at plot | 70 000 |
Plot expansion (m2) | 430 000 |
Region | The Stavanger region |
Municipality | Time |
Location coordinates | 58.659N, 5.794E |
Yearly avg air temperature | 7 |
Ready to start building construction within months | 3 |
Plot procurement status | reserved |
Power available now (MW) | 0 |
Power available in 12 months (MW) | 20 |
Power available in 24 months (MW) | 20 |
Power available in 36 months (MW) | 100 |
Latency to Dublin (ms) | 15 |
Latency to London (ms) | 10 |
Latency to New York (ms) | 42 |
Latency to Frankfurt (ms) | 13 |
Latency to Amsterdam (ms) | 12 |
Latency to Stockholm (ms) | 11 |
Latency to Oslo (ms) | 6 |
Latency to Esbjerg (ms) | 9 |
Latency to Newcastle (ms) | 9 |
Dark fibre available | no |
Fiber distance to | 2000 |
Fibre connection available at plot | no |
Distance international airport (km) | 30 |
Distance to industry harbor (km) | 25 |
Distance to university (km) | 30 |